Changes between Version 35 and Version 36 of GrantBudget


Ignore:
Timestamp:
Mar 7, 2016, 4:32:41 PM (4 years ago)
Author:
rathsman
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GrantBudget

    v35 v36  
    1313 * The overhead is currently 53.54% for Astronomy and 34.18% for Theoretical Physics, and these are automatically added in the excel documents together with the direct costs for premises (15.28% and 6.53% respectively).
    1414 * If the funding agency does not allow to use the grant for overhead (or has a maximum percentage allowed) the line ''samfinansiering'' on the first page of the excel document should be adjusted so that the project costs are balanced by the total funding and so that the amount applied for does not exceed the overhead limit set by the funding agency.
    15  * Even if the funding agency does not put a limit on the overhead (as is the case for VR), it is advisable to anyway limit the overhead applied for. For Astronomy this limit is currently 55%. The rest of the overhead should then be covered by ''samfinansiering''.
     15 * Even if the funding agency does not put a limit on the overhead (as is the case for VR), it is advisable to anyway limit the total overhead applied for (including premises). For Astronomy this limit is currently 55%. The rest of the overhead should then be covered by ''samfinansiering''.
    1616 * If you are applying for a VR infrastructure grant or an ERC grant, this should to be reported in advance to ''forskningssevice'' and may have to be signed by the vice chancellor.
    1717