Changes between Version 5 and Version 6 of ReleaseProcedure


Ignore:
Timestamp:
Jun 26, 2007, 5:41:12 PM (13 years ago)
Author:
Peter Johansson
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • ReleaseProcedure

    v5 v6  
    3737}}}
    3838 1. Make sure that all commits are performed into to the trunk, such
    39     as bumping version number(s) (source:trunk/configure.ac),
    40     acknowledge contributions (source:trunk/THANKKS), update
    41     source:trunk/NEWS and source:trunk/ChangeLog. [[br]][[br]]
     39    as bumping version number(s) ([source:trunk/configure.ac configure.ac]),
     40    acknowledge contributions ([source:trunk/THANKS THANKS]), update
     41    files [source:trunk/NEWS NEWS] and [source:trunk/ChangeLog ChangeLog]. [[br]][[br]]
    4242  i. Set the date for the new release in `NEWS`
    4343{{{
     
    7575     release. The section starts with:
    7676{{{
    77 Version A.B.C (released ?? ????? 200?)
     77Version A.B.1 (released ?? ????? 200?)
    7878}}}
    7979     Leave the release date blank for now. It will remain this way
    8080     until rolling time.
    8181  i. Commit change `svn ci -m "add a new NEWS section for upcoming
    82      A.B.C release"` [[br]][[br]]
     82     A.B.1 release"` [[br]][[br]]
    8383 1. Close the [http://lev.thep.lu.se/trac/svndigest/roadmap milestone]
    8484    associated with the release and add a new milestone as needed.